• HOME
  • ABOUT US
  • Products
    • ERW precision tubes EN 10305-3:2024
      • Round tubes acc. to EN 10305-3:2024
      • Square tubes acc. to EN 10305-3:2024
      • Rectangular tubes acc. to EN 10305-3:2024
      • Oval, semioval, ellipse tubes EN 10305-3:2024
    • Round pipes EN 10219 / 10255
    • Steel coils
    • Slit coils
    • Carbon steel sheets
    • Metal constructions
  • STEEL SERVICE CENTER
    • Cutting of pipes and profiles
    • Longitudinal cutting of coils
    • Laser cutting of tubes and profiles
    • Laser cutting of metal sheets
    • Welding and Bending
    • Powder coating
    • Laser engraving and cutting
  • STEEL SERVICE CENTER
  • LASER CUTTING
  • METAL TABLE LEGS
  • CERTIFICATES
  • NEWS
  • CONTACTS
Steelimpex Ltd.
  • HOME
  • ABOUT US
  • Products
    • ERW precision tubes EN 10305-3:2024
      • Round tubes acc. to EN 10305-3:2024
      • Square tubes acc. to EN 10305-3:2024
      • Rectangular tubes acc. to EN 10305-3:2024
      • Oval, semioval, ellipse tubes EN 10305-3:2024
    • Round pipes EN 10219 / 10255
    • Steel coils
    • Slit coils
    • Carbon steel sheets
    • Metal constructions
  • STEEL SERVICE CENTER
    • Cutting of pipes and profiles
    • Longitudinal cutting of coils
    • Laser cutting of tubes and profiles
    • Laser cutting of metal sheets
    • Welding and Bending
    • Powder coating
    • Laser engraving and cutting
  • CERTIFICATES
  • NEWS
  • CONTACTS
Another stage of rehabilitation and reconstruction has ended of Steelimpex buildings

Another stage of rehabilitation and reconstruction has ended of Steelimpex buildings

Steelimpex renovated its administrative building, located near of the newly built pipe production plant. In this way, modern working conditions were ensured, while at the same time higher energy efficiency of the building as a whole was achieved.

 

The production base of the Steelimpex Service Center also underwent renovation and reconstruction. In this way, preparations were made for the commissioning of facilities included in the company's investment plan, and more suitable conditions were provided for the performance of production processes. The workshops for laser cutting, painting and storage halls for the finished product are ready.

 

A new PV power station is also in the process of design and upcoming construction, which will complement the already installed capacity of 1 MW, in order to meet the needs of the administrative building and the Service Center with up to 100% green energy.

 

Административна сграда Стийлимпекс

Милко Минчев

07.11.2022

Uncategorised

Load More

USEFUL LINKS
  • HOME
  • ABOUT US
  • CERTIFICATES
  • NEWS
  • CONTACTS

All rights reserved © 2020-2025