• HOME
  • ABOUT US
  • ELCTRO-WELDED STEEL TUBES
    • Electro-welded steel tubes acc.EN10305-3and10305-5
    • Electro-welded steel tubes acc. EN 10219
    • Electro-welded steel pipes EN10219andEN10255-M
  • STEEL SERVICE CENTER
  • LASER CUTTING
  • METAL TABLE LEGS
  • CERTIFICATES
  • NEWS
  • CONTACTS
Blank template
  • HOME
  • ABOUT US
  • ELCTRO-WELDED STEEL TUBES
    • Electro-welded steel tubes acc.EN10305-3and10305-5
    • Electro-welded steel tubes acc. EN 10219
    • Electro-welded steel pipes EN10219andEN10255-M
  • STEEL SERVICE CENTER
  • LASER CUTTING
  • METAL TABLE LEGS
  • CERTIFICATES
  • NEWS
  • CONTACTS
The building of the new factory has finished and we have moved the first tube line.

The building of the new factory has finished and we have moved the first tube line.

The commissioning started.

 

 

 

 

 

 

Милко Минчев

03.07.2020

Uncategorised

Load More

USEFUL LINKS
  • HOME
  • ABOUT US
  • CERTIFICATES
  • NEWS
  • CONTACTS

All rights reserved © 2020